News

News

THE 8TH VODE VOJVODINE REGATTA SETS SAIL

The 8th Vode Vojvodine Regatta in a row set sail this morning from Novi Sad on a ten day cruise along the lowlands from 24 June to 3 July 2016. The start was marked by passing through the Novi Sad Ship Lock which connects the Danube-Tisa-Danube Canal and the Danube River.

Опширније »
News

THIRTY FISHING PLATFORMS ON THE CANAL NEAR SRBOBRAN

PWMC Vode Vojvodine continues its project Water for Life this year which is dedicated to the development and landscaping of the riverside, canals and protected natural areas, primarily taking care of local priorities.  The project’s top priority in 2016 is the establishment of adequate wooden structures (platforms) for fishing on

Опширније »
News

BEZDAN SHIP LOCK WAS BUILT 160 YEARS AGO

This year, PWMC Vode Vojvodine marks the 160th anniversary of the Bezdan Ship Lock construction which is one of the oldest ship locks on the canals in Vojvodina. This particularly significant structure of hydrotechnical heritage was the first structure in Europe which had been built by means of underwater concrete

Опширније »
News

ONLY SIX KILOMETERS OF THE SAVA UNDER FLOOD CONTROL

River stages in Vojvodina are still significantly falling. Flood control was terminated this morning on the Danube while regular flood control remains active on only 6 kilometers of flood embankment on Stojšića Bogaz site near Klenk and Hrtkovci. Gauge on the Sava near Sremska Mitrovica measures 576 cm this morning,

Опширније »
News

FLOOD CONTROL ON 270 KILOMETERS OF WATERCOURSES IN VOJVODINA

Approximately 270 kilometers of watercourses are under flood control since this morning in Vojvodina, of which 6 kilometers of the Sava River near Klenk and Hrtkovci settlements and Stojšića Bogaz site are under emergency flood control. Three seepages have been repaired on the Sava River near Klenk at sections where

Опширније »
News

EMERGENCY FLOOD CONTROL ON SIX KILOMETERS OF THE SAVA RIVER

Emergency flood control is performed on 6 kilometers of the Sava River flood embankment near Klenk and Hrtkovci settlements. Regular flood control is still performed on the remaining section of approximately 114 kilometers that are under jurisdiction of PWMC Vode Vojvodine. Emergency flood control was announced and introduced on Stojšića

Опширније »
News

DREDGING WORK PLAN FOR 2016

According to dredging work plan for „Lala“ and „Dunav“ floating dredgers for 2016, around 265,000 cubic meters of sludge should be removed from the DTD Hydro system. These works will begin mid-March with cca 95 mln Dinars being invested in dredging works. Works will be performed on five locations: Bečej–Bogojevo

Опширније »
News

THREE BILLIONS FOR WATER STRUCTURE MAINTENANCE

This year’s programme of operations of PWMC Vode Vojvodine intends nearly 3 bln Dinars for maintenance of water structures and facilities on the territory of Vojvodina. Around 2.3 bln Dinars is intended for maintenance and operation of the drainage system and regulation works on canal network. An amount of cca

Опширније »
  • Кориснички сервис

    Бесплатан позив

    0800 21 21 21

    Радно време 9-14 часова

    korisnik@vodevojvodine.rs


    ШАЛТЕР САЛА СЛУЖБЕ ЗА НАКНАДЕ

    РАДНИМ ДАНИМА 8-14 ЧАСОВА
    Кориснички сервис
    Бесплатан позив

    0800 21 21 21

    Радно време 9-14 часова
    korisnik@vodevojvodine.rs

    ШАЛТЕР САЛА СЛУЖБЕ ЗА НАКНАДЕ

    РАДНИМ ДАНИМА 8-14 ЧАСОВА