Drainage

Drained areas:

  • Bačka and Banat District 1.423.076 ha
  • Srem District 353.433 ha

Total: 1.776.509 ha


Length of drainage canals: 

  • Bačka i Banat 15.576 km
  • Srem 5.110 km

Total: 20.094 km:

Constructed drainage systems

  • Number of sistems 331
  • Canals 20.687 km
  • Canal density 12,5 m/h
  • Pipe drainage 45.146 ha
  • Pumping stations 161 sa 370 m3/s

*Based on data from 2025.

Drainage

Drained areas:

  • Bačka and Banat District 1.423.076 ha
  • Srem District 353.433 ha

Total: 1.776.509 ha


Length of drainage canals: 

  • Bačka i Banat 15.576 km
  • Srem 5.110 km

Total: 20.094 km:

Constructed drainage systems

  • Number of sistems 331
  • Canals 20.687 km
  • Canal density 12,5 m/h
  • Pipe drainage 45.146 ha
  • Pumping stations 161 sa 370 m3/s

*Based on data from 2025.

  • Кориснички сервис

    Бесплатан позив

    0800 21 21 21

    Радно време 9-14 часова

    korisnik@vodevojvodine.rs


    ШАЛТЕР САЛА СЛУЖБЕ ЗА НАКНАДЕ

    РАДНИМ ДАНИМА 8-14 ЧАСОВА
    Кориснички сервис
    Бесплатан позив

    0800 21 21 21

    Радно време 9-14 часова
    korisnik@vodevojvodine.rs

    ШАЛТЕР САЛА СЛУЖБЕ ЗА НАКНАДЕ

    РАДНИМ ДАНИМА 8-14 ЧАСОВА